Expert Consultancy

Consulting Services · Ethiopian Service Providers

is continuously in good growing financial progress. EC has continuously shown a profitable record since its establishment, despite different challenges like COVID-19 and security issues in the country. EC has good achievement in project completion as per the satisfaction of the client and gets paid as per the contract shown in the below figure AREAS OF OPERATION We were undertaking projects throughout Ethiopia and we have a plan to work across the borders. EC is proud to be associated with some large and very successful companies in Ethiopia and also takes pride in addressing any magnitude of project that is challenging and can result in the optimization to the benefit of our client Some of Experience 1. Bulk water supply for Wolkite 7000ha Sugar Development Irrigation Project Client: BARAN International-Isrial company Construction Project Cost: 230 million Euro Surveying work, Design, and Construction supervision Two intakes in Tekeze River 62km GRP pipe (dia 1500-600mm) line Four earthen reservoirs capacity of 100,000-45,000m3 Construction of six pumping stations Access road and service road 7000ha subsurface drip irrigation Two intakes in Tekeze River 62km GRP pipe (dia 1500-600mm) line Four earthen reservoirs capacity of 100,000-45,000m3 Construction of six pumping stations Access road and service road 7000ha subsurface drip irrigation 2. Preparation of water Allocation Plan /WAP/ for Ziway-Shalla Sub Bas in Client: Ministry of Water and Energy Review existing water potential and demand data for WAP To identify the detailed activities that will take in the WAP planning from start to end following water allocation planning steps and ultimately leading to implementation on the ground. To develop WAP data using the WEAP model. To formulate a comprehensive water allocation plan for the development of WAP in the Meki River, Lake Ziway, and Bulbula Area. To design mechanisms/management options for rational use of water resources between sectors and competing users within the sub-basin. To design ways of WAP implementation strategy in pilot area (Bulbula, Ziway Lake, and Meki) Review existing water potential and demand data for WAP To identify the detailed activities that will take in the WAP planning from start to end following water allocation planning steps and ultimately leading to implementation on the ground. To develop WAP data using the WEAP model. To formulate a comprehensive water allocation plan for the development of WAP in the Meki River, Lake Ziway, and Bulbula Area. To design mechanisms/management options for rational use of water resources between sectors and competing users within the sub-basin. To design ways of WAP implementation strategy in pilot area (Bulbula, Ziway Lake, and Meki) 3. TECHNICAL FEASIBILITY ASSESSMENT FOR HAFIR DAM, RIVER INTAKE, AND SHALLOW HAND-DUG WELLS AND DEVELOP SITE-SPECIFIC TECHNICAL DESIGNS IN SOMALI REGIONAL STATE, AFDHER ZONE , Client: Islamic Relief The objective of the…

Arada Sub-City, Woreda 09, Arat Kilo, Tesmin Building, Addis Ababa, Ethiopia

+251 11 812 1043

+251 911 412 936

expert.ethiopia@gmail.com

Website coming soon

Expert Consultancy is listed on Digital Ethiopia — a full website for this business hasn't been built yet.

Is this your business?

Claim this business

Keep looking

More consulting services in Addis Ababa

See all Consulting Services in Addis Ababa